• Michael Intravartolo

Quick Tip: Routing Link Codes



Routing Link Codes is used to reduce inventory based on routing steps. Components in BOM can be linked to specific steps in Routing Link Codes. This is very useful in long manufacturing process because material inventory can be reduced without waiting for the item to be completely manufactured. Inventory will be reduced while the item is being manufactured.

There are 3 types of flushing methods in Routing Link Codes:

  1. Manual: Inventory is affected when user post cosumption or production journal

  2. Forward: Inventory is affected when routing step is started

  3. Backward: Inventory is affected when routing step is completed

To link BOM components to Routings:

  1. Open the Item Card for Item with value in both Routing No. and Production BOM fields.

  2. Open the Routing Card for the Routing No. selected.

  3. Select a Routing Link Code for each routing lines.

  4. Open Production BOM card.

  5. Enter the same Routing Link Codes into the Production BOM lines. Lines will the same Routing Link Codes will be linked.

#microsoftdynamicsnav

31 views
Contact Us

Solution Systems, Inc.

3201 Tollview Dr. 

Rolling Meadows, IL 60008

Office: 847-590-3000

Email: info@solsyst.com

Support: 224-345-2020

Support Email: support@solsyst.com

Connect With Us
  • Manufacturing Software | Illinois
  • Manufacturing Software | Illinois
  • Manufacturing Software | Illinois
  • Manufacturing Software | Illinois
  • Manufacturing Software | Chicago
  • Manufacturing Software | Illinois
  • Microsoft Business Podcast
  • Manufacturing Software | Chicago
  • Manufacturing Software | Chicago
  • Manufacturing Software | Chicago
Join our Mailing List

© 2020 Solution Systems, Inc.